- FCA regulatedAppointed Representative, FRN 1031964
- 60+ lendersA panel of lenders, not one bank
- 5.0 from 20 Google reviews
- No credit checkEnquiring leaves no mark on your file
Yes, but a dock leveller is firmly a building fixture and should be approached on that basis. It sits in a pit built into the dock face, is wired into the building and cannot be removed without a contractor and making good afterwards. Funders will finance loading bay installations, and do so regularly, but they underwrite the business rather than the steel and will often want landlord consent in a leased unit. Mobile yard ramps are the exception. They are wheeled, movable assets and fund very differently.
Who finances this
Distribution centres upgrading an old bay, food operators adding refrigerated dock shelters, and businesses taking on a unit whose existing levellers are worn out or failing inspection. The trigger is usually a leveller breakdown that has closed a bay during a peak, a driver injury or near miss, or a move to curtainsider or double-deck trailers that the existing dock cannot serve safely.
How lenders see it
Semi-fixed and priced accordingly, which is the part suppliers rarely mention. A hydraulic leveller installed in a concrete pit is worth very little once removed, because most of the value was in the installation and each pit is dimensioned to its own bay. So funders look at your accounts, your lease term and, frequently, a landlord waiver. Dock shelters, buffers, wheel restraints and traffic lights are in the same category. What lifts a loading bay project is context: presented alongside the forklifts, conveyors and wrappers that go into the same despatch upgrade, the package has genuine asset backing and prices far better than the bay equipment alone. Mobile yard ramps and container ramps, by contrast, are wheeled plant with a good used market and fund like machinery.
Buying used
Rarely for installed levellers, since the value dies with the installation; yes for mobile yard ramps, which are funded second-hand without much difficulty.
Also in forklift and warehouse equipment finance
See everything we fund in forklift and warehouse equipment finance →
Stock bought months before it sells
Flowzo funds stock and marketplace payout cycles, the money tied up on the shelves the racking is holding.
Machines we have funded
| Stertil Dock Leveller | Hydraulic swing lip dock leveller |
|---|---|
| Stertil Dock Shelter | Inflatable loading bay dock shelter |
| Hormann HLS 2 | Hydraulic telescopic lip dock leveller |
| Hormann DSS Dock Shelter | Curtain style loading bay shelter |
| Thorworld Yard Ramp | Mobile container loading ramp |
| Thorworld Dock Leveller | Static hydraulic loading dock leveller |
| Assa Abloy Crawford DL6010 | Hydraulic dock leveller for loading bays |
| Loading Systems Dock Shelter | Loading bay sealing shelter |
| Rite-Hite Dok-Lok | Vehicle restraint for loading bays |
| Joloda Loading System | Trailer load and unload skate system |
Why is a dock leveller harder to fund than a forklift?
Because once it is installed there is nothing to take back. The pit, the concrete, the wiring and the making good are where the money went, and a second-hand leveller lifted out of a bay is worth a small fraction of the project cost. Funders therefore rely on your business rather than on the equipment.
Would a mobile yard ramp be a better option for us?
Operationally it depends on your trailer types and yard space, but financially it is a much easier asset. A yard ramp is wheeled, movable, serialised and sells readily second-hand, so it funds like plant rather than like building works. Many businesses use one as an interim step before committing to a fixed bay.
Do we need landlord consent for a loading bay installation?
Very likely, because you are altering the building fabric. Most commercial leases require consent for works of that kind, and funders will ask whether it has been obtained. It is worth starting that conversation with the landlord early, since it can take longer than the finance approval itself.
Can dock shelters and safety equipment go on the same agreement?
Yes, where they form part of one supplier project. Shelters, buffers, wheel restraints and bay lighting are all soft in isolation but perfectly fundable within a wider facility. Keeping the scope to the loading bay package rather than general building repairs helps the application through.
Is refurbishment of an existing leveller fundable?
Sometimes, though it is closer to maintenance than to buying an asset and several funders will decline it on that basis. Where the refurbishment is substantial and forms part of a larger bay upgrade, it can ride within the project. A pure repair is generally better paid from working capital.
Tell us what you need
About a minute of plain questions, and no documents to dig out.
Prime is established and profitable with clean credit. Specialist covers newer businesses and credit that needs explaining, the asset carries part of the risk, so finance is often available where an unsecured loan is not.
Total repayable about £,
Illustrative only, not a quote. Flat rates are indicative, subject to status and are not an APR. Figures are for limited companies on unregulated agreements and exclude VAT and fees. Sole traders and partnerships borrowing £25,000 or less may be regulated and are quoted differently.
Start my enquiryNo credit check, and enquiring leaves no mark on your credit file. Finance is subject to status. We are a credit broker, not a lender.
Only pricing it up?
An enquiry is a conversation, not an application. Nothing runs against your file until you tell us to go ahead.
No credit check to enquire
Your credit scoreUntouched
Conor reads every enquiry himself. We will call you within 24 business hours, and it will be the person who actually arranges the finance, not a call centre, and not a form that disappears.A real person on your side
One adviser from your first enquiry to the money in your account. No call centres.
Your adviser
Conor HullMon to Fri, 9am–6pm
5.0 from 20 Google reviews
Thinking about dock leveller finance?
A few questions, and we will tell you what the panel can do. No obligation, and no call centres.
